| 2008 Water System Report |
|
|
2008 PUBLIC WATER SYSTEM ANNUAL REPORT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
BACETERIOLOGICAL
MONITORING AND REPORTING
|
Regulatory Requirement |
PWS Performance |
|
Number of raw/incoming water samples |
26 |
27 |
|
Number of treated water samples |
26 |
27 |
|
Number of distribution water samples |
26 |
57 |
|
Frequency of testing |
Bi-weekly |
100% |
|
Total coliform present in water samples |
0 TC per 100 mL |
100% |
|
E.coli present in water samples |
0 EC per 100 mL |
100% |
|
COMMENTS: The Town of The Pas Water System has met all the regulatory requirements for 2008. |
||
Turbidity is a measurement of clarity of water. We use this test as a benchmark on how our treatment process is working. We are also obligated to meet regulatory requirements on the filtering process and the treated water that is sent to our consumers. The results of these tests are shown in the table below:
|
Turbidity Standards |
Regulatory Requirement |
PWS Performance |
|
Chemically assisted, rapid gravity filtration process |
< 0.3 NTU in at least 95% of the samples taken
per month |
94% |
|
Not to exceed 0.3 NTU for more than 12 continuous hours |
94% |
|
|
Not to exceed 1.0 NTU at anytime |
98% |
|
|
Frequency of testing |
Daily |
94% |
DISINFECTION
TESTING & MONITORING
This testing is done to ensure that the water is safe for the consumer and to meet the regulatory requirements. The results of these tests are shown in the table illustrated below:
|
Chlorine
Requirements |
Regulatory
Requirement |
PWS Performance |
|
(A) Free chlorine residual entering the distribution system |
> 0.5 mg/L |
100% |
|
(B) Free chlorine residual in the distribution system |
> 0.1
mg/L |
70% |
|
(C) Frequency of testing |
Daily for A |
100% |
|
Bi Weekly for B |
100% |
|
|
(D) Report submissions |
Monthly |
100% |
A fluoride content test is done to the treated water to determine mg/L of fluoride in the treated water and to meet regulatory requirements. The results of these tests are show in the table below:
|
|
Samples Taken |
Composited Samples Required |
Composited Samples Done |
|
Number of fluoride samples |
Daily |
26 |
26 |
|
Flouride mg/L required 0.8-1.2 mg/L |
100% |
100% |
100% |
These tests are done to meet Regulatory requirements. The results of these tests are shown on the following table:
DISINFECTION BY
–PRODUCTS MONITORING AND REPORTING
|
Regulatory Requirement |
PWS Performance |
|
A) Trihalomethane sampling requirements |
4 times per year |
100% |
|
B) Total Trihalomethane Standard |
0.1 mg/L |
0.0693 mg/L |
|
C) Bromodichloromethane sampling requirements |
4 times per year |
100% |
|
D) Bromodichloromethane Standard |
0.016 mg/L |
0.0081 mg/L |
WATER CHEMISTRY ANALYSIS
Chemical analysis tests were done on the raw and treated water on September 15, 2008. The treated water met all the Guidelines for Canadian Drinking Water Quality maximum acceptable concentrations for health-based parameters.
|
Chemical Parameter |
PWS Performance (mg/L) |
Maximum Acceptable Concentration (mg/L) |
Did we meet the Standard? |
|
Antimony |
0.0005 |
0.006 |
Yes |
|
Nitrate & Nitrite |
0.01 |
10 |
Yes |
|
Arsenic |
0.0004 |
0.01 |
Yes |
|
Barium |
0.063 |
1 |
Yes |
|
Boron |
0.02 |
5 |
Yes |
|
Cadmium |
<0.00004 |
0.005 |
Yes |
|
Chromium |
<0.0002 |
0.05 |
Yes |
|
Selenium |
<0.0002 |
0.01 |
Yes |
|
Uranium |
0.0005 |
0.02 |
Yes |
|
Dissolved Fluoride |
1.33 |
1.5 |
Yes |
|
Lead |
<0.0002 |
0.01 |
Yes |
EMERGENCY-COMPLIANCE
ISSUES-2008
· There were 28 water breaks in 2008. One of the water breaks on Edwards Avenue put the Water Treatment Plant at risk due to low water levels in the clear wells.
· There were a number of non-compliance situations with turbidity regulations and chlorine residuals in the distribution system. The AECOM report on upgrades will address the chlorine residual problems. The turbidity issues were addressed in house to ensure the probability of future problems is negligible.
EXPENSES & UPGRADES
An engineering study was done on the water treatment plant in 2008 to determine the plants ability to meet current and future regulations and as a result there are a number of recommendations that are under review.
For general questions during regular business hours call the Engineering Dept. at
(204) 627-1125.
For emergency calls please phone (204) 623-2330
______________________________
Vincent Anderson, P.Eng
Municipal Superintendent
Town of The Pas
| < Prev | Next > |
|---|
Get the Flash Player to see this player.
Flash Image Rotator Module by Joomlashack.
Welcome to The Pas
Image 2 Title
Image 3 Title
Image 4 Title
Image 5 Title